Service area: Chicago and northern Illinois (ComEd service area). Prices last checked against the utility’s filed tariff on September 24, 2026.

Your schedule: Small Load Medium Load

Price your own month

These are the base charges in ComEd's commercial rate schedules that DEKALOS covers, from what Commonwealth Edison Company filed with its state regulator: the fixed charge, the demand charge and the energy charge, each with the date it took effect and the sheet it comes from. Where a sheet splits one charge into parts, the price here is their sum. The schedule on a bill is printed near the meter readings, as the rate, the rate schedule or the service classification.

Small Load — Small Load Delivery Class, secondary voltage

Effective September 2026 billing (adjustment factors) · ComEd Ill. C. C. No. 10 Informational Sheets 9, 18, 20, 56, 62, 64.3, 64.17, 65

Small Load, Small Load Delivery Class, secondary voltage: the base charges Commonwealth Edison Company filed (effective September 2026 billing (adjustment factors)), with its filed adjustment factors applied by DEKALOS. Source: ComEd Ill. C. C. No. 10 Informational Sheets 9, 18, 20, 56, 62, 64.3, 64.17, 65; icc.illinois.gov .../tariff/currentbooks/1/.
ChargeApplies toPrice with adjustment factors applied
Customer and metering chargesEach month$21.77 a month
Distribution facilities chargeEvery kW of billing demand$12.907425 a kW
Energy chargeEvery kWh$0.001176 a kWh

These factors apply to September through December 2026 bills; ComEd resets them after that.

Medium Load — Medium Load Delivery Class, secondary voltage

Effective September 2026 billing (adjustment factors) · ComEd Ill. C. C. No. 10 Informational Sheets 9, 18, 20, 56, 62, 64.3, 64.17, 65

Medium Load, Medium Load Delivery Class, secondary voltage: the base charges Commonwealth Edison Company filed (effective September 2026 billing (adjustment factors)), with its filed adjustment factors applied by DEKALOS. Source: ComEd Ill. C. C. No. 10 Informational Sheets 9, 18, 20, 56, 62, 64.3, 64.17, 65; icc.illinois.gov .../tariff/currentbooks/1/.
ChargeApplies toPrice with adjustment factors applied
Customer and metering chargesEach month$36.54 a month
Distribution facilities chargeEvery kW of billing demand$13.000635 a kW
Energy chargeEvery kWh$0.001157 a kWh

These factors apply to September through December 2026 bills; ComEd resets them after that.

What these prices leave out

These prices are DEKALOS's arithmetic: each base charge Commonwealth Edison Company filed, adjusted by the adjustment factors it filed (IDUFN, DRAF, EDAF, TPAF, RBAF and the DG Rebate Adjustment; the bill marks the adjusted lines "& ADJ"). A bill may print the base charge and the adjustment as separate lines. Other riders, surcharges, taxes and the supply of the electricity itself are not included, so they are not a bill’s total, and a gap between the two is not by itself a mistake.

In this state you can buy the electricity itself from a supplier of your choice, so ComEd's schedules price delivery only. The supply half of the bill is priced by your supplier's contract or the utility's default service, and is not on this page.

Price one month on your own schedule

Type the month’s kWh and billed kW from your bill, and the checker writes out that month’s base charges on your schedule, line by line. Nothing you type leaves the page.

Price your own month Or send one bill for a review